Hydrogeology and Hydrogeochemistry
Oak Ridges Moraine Hydrogeology Study: Overview
 
Bolton Acquifer Simulated Drawdown (100 Year)
(Avg. Daily Wellfield Production 5,000 m3/day)

Bolton Acquifer
Source:
  Groundwater Quantification Study, Region of Peel (1997)
Full Notes:
  No Drawdown = 215 masl
  35m Drawdown = 180 masl

 © 2001, Hunter GIS